Ongoing Projects
Transforming Vision Into Reality

Thane Residential Development 23-Storey Residential Tower
Supporting one of Mumbai's landmark residential developments through a dedicated captive Ready-Mix Concrete plant, ensuring consistent quality, timely supply, and seamless project execution.

Thane Commercial DevelopmentPiling & Foundation Stage
An ongoing residential development project in Thane, showcasing Sabari's integrated capabilities in construction, project management, and end-to-end development.

Runwal City Centre
RMC Plant
36-Acre Integrated Township | Kanjurmarg (E), Mumbai
Dedicated RMC Facility
A captive batching plant established to ensure continuous and reliable concrete supply throughout the project lifecycle.
Consistent Supply & Quality
Advanced production systems and quality controls delivering high-performance concrete that meets stringent construction standards.
Supporting Landmark Development
Contributing to one of Mumbai's premier township developments through dependable execution and engineering excellence.
Projects over the years
waterproofing, mechanical and civil projects (GOVERNMENT & PRIVATE)

Commercial Disposal Works
Supporting port infrastructure development.

Backwash Water Recirculation System
Advanced water recycling for treatment plants.

Fire Fighting Pumping Station
Critical fire protection and pumping infrastructure installation.

Sand Dredging Operations
Dredging and material handling for marine infrastructure projects.

Storm Water Drainage System
Urban drainage infrastructure enhancing water management capacity.

Meta-Chem Dosing System Projects
Specialized chemical dosing systems for municipal water treatment.
Projects over the years
Infrastructure & Highway Projects.

NH-66, Ratnagiri, MH
Four-Laning: Aaravali–Kante Section. Aggregate supply + CBP installation
Client: MEP
Status: Completed in 2012
NH-8, Surat–Navsari
Six-Laning. Embankment, Subgrade, GSB, WMM, Structures (18 km)
Client: IRB-MRM
Status: Completed in 2010

Dighi Port, Raigad
Excavation & Reclamation, Controlled Blasting. Greenfield SEZ Port
Client: BIPL / Dighi Port
Status: Completed in 2011
Jaigad Port, Ratnagiri
Commercial Project for Material Disposal at Port
Client: MEP
Status: Completed in 2011
